Tata Power Company Limited – Strategic Engineering Division – Vemgal

Tata Power Company Limited - Strategic Engineering Division – Vemgal

Built by Tata Power for their Strategic Engineering Division, these manufacturing units spanning a total built up area of 63,878 sq. mt. are located in Vemgal, Karnataka. The design, procurement, installation, and commissioning of the Fire Protection Systems and the Public Health Engineering Systems for the project were completed.

Project Snapshot

Fire Protection Systems
  • 29,640 meters of GI piping
  • 2,198 meters of DI piping
  • 7,770 sprinklers
  • 175 hydrant valves
  • 1 sets of pumps (a set consists 1 jockey pump, 2 electrical driven pumps, and
    1 diesel generator driven pump)
Public Health Engineering (PHE) Systems
  • 17,070 meters of piping (CPVC & GI)
  • 3 sets of pumps
Embassy One — Bangalore

Embassy One — Bangalore

Embassy One’s office block and hotel block, built on prime real estate near the Bangalore Palace Grounds, spans an area of 2,618,680 sq. mt. The design, procurement, installation, and commissioning of the numerous systems for the project was completed.

Systems Installed

  • Fire Detection and Alarm Systems
  • Integrated Voice Evacuation System
  • Fire Fighters’ Telephone System
  • Fire Hydrant Systems
  • Sprinkler Systems
  • Pump Rooms

Project Snapshot

Fire Protection Systems
  • 32,000 meters of piping
  • 2,750 sprinklers
  • 2 sets of pumps (each set consists
    1 jockey pump, 2 electrical driven
    pumps, and 1 diesel generator driven pump)
Fire Detection and Alarm Systems
  • 3,337 detectors
  • 1,724 speakers
  • 110,00 meters of fire alarm cabling
  • 4 fire alarm panels + 2 digital voice command systems + 2 annunciator panels

The hotel block was completed and handed over to the engineering team of the Hotel Operations Group of a leading hospitality chain.

Helios Business Park (KTPL) — Bangalore

Helios Business Park (KTPL) — Bangalore

Helios Business Park’s three high-rise office blocks are built in Kadubeesanahalli Village, Varthur Hobli, Bangalore and covers an area of 42,551,595 sq. mt. The design, procurement, installation, and commissioning of the numerous systems for the project was completed in 36 months.

This project required a high level of coordination and planning with the developer and the end-user. Which meant our project team had to liaison with multiple stakeholders such as architects, project management companies, construction managers, and compliance teams throughout the duration of the project.

Systems Installed

  • Fire Detection and Alarm Systems
  • Integrated Voice Evacuation System
  • Fire Fighters’ Telephone System
  • Fire Hydrant Systems
  • Sprinkler Systems
  • Pump Rooms

Project Snapshot

Fire Protection Systems
  • 94,745 meters of piping
  • 25,905 sprinklers
  • 549 hydrant valves
  • 3 sets of pumps (each set consists
    1 jockey pump, 2 electrical driven pumps, and 1 diesel generator driven pump)
Fire Detection and Alarm Systems
  • 3,281 detectors
  • 129,450 meters of fire alarm cabling
  • 37 fire alarm panels + 3 digital voice command systems

Our team was acknowledged by the stakeholders for its stringent safety practices and for the timely completion of the project.

RGA Tech Park – Bangalore

RGA Tech Park – Bangalore

RGA Tech Park, built in Bangalore’s IT Corridor, is spread across four blocks with 3,000,000 sq. ft. of office space. The design, procurement, installation, and commissioning of the numerous systems of the project was completed in 12 months.

Systems Installed

  • Fire Detection and Alarm Systems
  • Public Address Systems
  • Fire Hydrant Systems
  • Sprinkler Systems
  • Pump Rooms

Project Snapshot

Fire Protection Systems
  • 83,000 meters of piping
  • 19,200 sprinklers
  • 383 hydrant valves
  • 6 sets of pumps (each set consists
    1 jockey pump, 2 electrical driven pumps, and 1 diesel generator driven pump)
Fire Detection and Alarm Systems
  • 3,100 detectors
  • 49,100 meters of fire alarm cabling
  • 4 fire alarm panels

The project, on completion, was inspected and approved by the State Fire and
Emergency Services.